The project replaced an 18,000-ft2 parking lot within the school’s 33-acre campus. Most students arrive at the suburban site by bus or carpool. The project’s contribution to the urban heat-island effect is reduced through the use of green roofs, covered parking, and high-albedo paving.
The project team clustered the buildings around an existing ridgeline and stepped them with the natural topography to minimize their impact on the site. Green roofs on the library and student center provide habitat for indigenous species. The project reduces water use through the use of drought-tolerant landscaping and drip irrigation as well as waterless urinals, dual-flush toilets, and other efficient plumbing fixtures.